上网赚钱真假

Looking forward to your favourable inquiry!

×
BackHome > Service > Logistics

Logistics:
When steel pipe is completed and operational, it is the result of cooperation between a number of parties in the supply chain. These parties perform steps which are sequential and overlapping involved in the design, manufacturing, blasting, coating, handling, storage, transport and construction of steel pipe.



                                                                                               1。 FINAL TEST---- Pipe on warehouse

         

         


                                                                                                                    2.FINAL TEST



         

         


                                                                                                   3。 LOADING ON TO THE TRUCK



         

         


                                                                                                   4. LOADING ON TO THE TRUCK



         

         


                                                                                                       5. LOADING TO CONTAINER


          

          



    Pipe Protection:

Pipe-end protection is advisable in case the pipe-ends are bevelled at the pipe manufacturer. In the case of overseas transport, there is an especially increased risk of damaged pipe-ends. This is caused by extra handling procedures in ports and shifting of the pipes onboard vessels.



COPYRIGHT©2011~2018 DMH UNITED STEEL INDUSTRY CO.,LTD All Rights Reserved. www.onstageadmin.com    Links

聚沙彩票注册 2019挂机网赚游戏 三分快3计划 北京快乐8 2019年网赚做什么好 湖北快3走势 广发彩票 2019免费网赚挂机 马会资料大全香港正版 聚发彩票注册